Journal Screenshot

International Journal of Academic Research in Accounting, Finance and Management Sciences

Open Access Journal

ISSN: 2225-8329

A Study of TOC Supply Chain Replenishment System in LED Chip Manufacturing Plant

Horng-Huei Wu, Liang-Ying Wei, Chih-Hung Tsai, Yi-Chan Chung, Shu-Fang Lin

http://dx.doi.org/10.6007/IJARAFMS/v10-i3/8398

Open access

The LED chip manufacturing (LED-CM) is an important process in the LED supply chain. To meet the severely competitive pressure these years, the issue of inventory risk for the variety of products is an imperative task for the LED-CM plant. The TOC supply chain replenishment system (TOC-SCRS) is one of the potential solutions to effectively manage inventory in the industry. However, the special features of the unstable production output and a product composed of the chips of different Bins exist in the LED-CM plant. Therefore, the application of TOC-SCRS to the LED-CM plant will encounter the following issues: (1) How to determine the optimal inventory buffer of the chips in the different Bins because a product can be composed of different combination of the chips in the feasible Bins? This paper proposed optimal Bin allocation models to resolve this problem. The optimal Bins inventory combination of a case is further performed via LINGO system and utilized to demonstrate the feasibility of these models. Employing the proposed models will facilitate LED-CM plants to improve their throughput and competitiveness.

Aytug, H., Lawley, M. A., Mckay, K., Mohan, S., and Uzsoy, R. (2005), “Executing production schedules in the face of uncertainties: A review and some future directions,” European Journal of Operational Research, Vol. 161, No. 1, pp.86-110.
Beamon, B. M. (1998), “Supply chain design and analysis: Models and methods. International Journal of Production Economics, Vol. 55, No. 3, pp.281-294.
Belvedere, V., and Grando, A. (2005), “Implementing a pull system in batch/mix process industry through theory of constraints: A case-study,” Human Systems Management, Vol. 24, No. 1, pp.3-12.
Blackstone, J. H. (2001), “Theory of constraints –a status report,” International Journal of Production Research, Vol. 39, No. 6, pp.1053-1080.
Cole, H., and Jacob, D. (1994), “Introduction to TOC Supply Chain, USA: AGI institute (2002).
Goldratt, E.M., (1994), “It’s Not Luck,” England: Gower.
Hoffman, G., and Cardarelli, H. (2002), “Implementing TOC Supply Chain: A Detailed Case Study – MACtac,” USA: AGI Institute.
Holt, J. R. (1999), “TOC in Supply Chain management,” 1999 Constraints Management Symposium Proceedings, pp.85-87, March 22-23, Pheonix, AZ, U.S.A, USA: APPICS.
Jiang, X. Y., and Wu, H. H. (2013), "Optimization of setup frequency for TOC supply chain replenishment system with capacity constraints," Neural Computing and Applications, Vol. 23, No. 6, pp.1831-1838.
Jiang, X. Y., Wu, H. H., and Tsai, T. P. (2013), "A Study of Diverse Replenishment Frequency Model for TOC Supply Chain Replenishment Systems under Capacity Constraint," International Journal of Modelling, Identification and Control, Vol. 19, No. 3, pp.248-256.
Kendall, G. I. (2004), “Viable Vision - Transforming Total Sales into Net Profits,” USA: J. Ross Publishing, Inc.
Kaijun, L., and Wang, Y. (2010), “Research on inventory control policies for nonstationary demand based on TOC,” International Journal of Computational Intelligence Systems, Suppl. 1, pp.114-128.
Lee, C. W., Chien, C. F., and Zheng, J. N. (2011), “The Optimal Decision System of LED Chip Releasing and Purchasing,” Proceedings of the 2011 Annual Conference of the Chinese Institute of Industrial Engineers, Hsin-Chu, Taiwan.
Levi, D. S., Kaminsky, P., and Levi, E. S. (2008), “Designing and Managing the Supply Chain- Concepts, Strategies and Case Studies,” McGraw-Hill Companies, Inc.
Novotny, D. J. (1997), “TOC Supply Chain Case Study,” 1997 APICS Constraints Management Symposium Proceedings, pp.78-79, April 17-18, Denver, Colorado, U.S.A, USA: APPICS.
Patnode, N. H. (1999), “Providing Responsive Logistics Support: Applying LEAN Thinking to Logistics,” 1999 Constraints Management Symposium Proceedings, pp.93-96, March 22-23, Pheonix, AZ, U.S.A, USA: APICS,
Perez, J. L. (1997), “TOC for world class global supply chain management,” Computers & Industrial Engineering, Vol. 33, pp.289-293.
Schragenheim, E. M. (2002), “Make-to-Stock under Drum-Buffer-Rope and Buffer Management Methodology,” 2002 International Conference Proceedings, APICS~ The Educational Society for Resource Management.
Schragenheim, E., and Dettmer, H. W. (2001), “Manufacturing at Warp Speed: Optimizing Supply Chain Financial Performance,” Florida: St. Lucie Press, U.S.A.
Schragenheim, E., and Ronen, B. (1991), “Buffer management: a diagnostic tool for production control,” Production and Inventory Management Journal (second quarter), pp.74-79.
Sharma, K. (1997), “TOC Supply Chain Implementation: System Strategies,” 1997 APICS Constraints Management Symposium Proceedings, pp.66-74, April 17-18, Denver, Colorado, U.S.A, USA: APICS.
Simatupang, T. M., Wright, A. C., and Sridharan, N. (2004), “Applying the theory of constraints to supply chain collaboration,” Supply Chain Management: An International Journal, Vol. 9, No. 1, pp.57-70.
Smith, D. A. (2001), “Linking the Supply Chain Using the Theory of Constraints Logistical Applications and a New Understanding of the Role of Inventory/Buffer Management, “ 2001 Constraints Management Technical Conference Proceedings, pp.64-67, March 19-20, San Antonio, Texas, U.S.A, USA: APICS.
Waite, J., Gupta, S., and Hill, E. (1998), “Meritor HVS Story,” 1998 APICS Constraints Management Symposium Proceedings, pp.1-9, April 16-17, Seattle Washington, AZ, U.S.A, USA: APICS.
Watson, K., and Polito, T. (2003), “Comparison of DRP and TOC financial performance within a multi-product, multi-echelon physical distribution environment,” International Journal of Production Research, Vol. 41, No. 4, pp.741-765.
Wu, H. H., Chen, C. P., Tsai, C. H., and Tsai, T. P. (2010), “A Study of an Enhanced Simulation Model for TOC Supply Chain Replenishment System under Capacity Constrain,” Expert Systems with Applications, Vol. 37, No. 9, pp.6435-6440.
Wu, H. H., and Li, M. F. (2011), “A study of the order fulfillment and production model for the LED die manufacturer,” Proceedings of the 2011 Annual Conference of the Chinese Institute of Industrial Engineers, Hsin-Chu, Taiwan.
Wu, H. H., Tsai, S. H., Tsai, C. H., Tsai, R., and Liao, M. Y. (2011), “A study of supply chain replenishment system of theory of constraints for thin film transistor liquid crystal display (TFT-LCD) plants,” African Journal of Business Management, Vol. 5, No. 21, pp.8617-8633.
Wu, H. H., Huang, H. H., and Jen, W. T. (2012), “A Study of the Elongated Replenishment Frequency of TOC Supply Chain Replenishment Systems in Plants,” International Journal of Production Research, Vol. 50, No. 19, pp.5567-5581.
Wu, H. H., Li, M. F., and Hsu, T. F. (2013a), “An order fulfillment model for the LED chip manufacturing plant, “Advanced Materials Research, Vols. 694-697, pp.3446-3452.
Wu, H. H., Li, M. F., and Yeh, C. H. (2013b), “A Study of the Material Re-issued Models for an Insufficient Output of the LED Chip Manufacturing Plant,” Advanced Materials Research, Vols. 694-697, pp.3434-3440.
Wu, H. H., Li, M. F., and Hsu, T. F. (2013c), “A Study of an order fulfillment model for the LED chip manufacturing plant,” Advanced Materials Research, Vols. 694-697, pp.3446-3452.
Wu, H. H., Lee, A. H. I., and Tsai, T. P. (2014), “A two-level replenishment frequency model for TOC supply chain replenishment systems under capacity constraint,” Computers & Industrial Engineering, Vol. 72, No. 2, pp.152-159.
Yuan, K. J., Chang, S. H. and Li, R. K. (2003), “Enhancement of theory of constraints replenishment using a novel generic buffer management procedure,” International Journal of Production Research, Vol. 41, No. 4, pp.725-740.

In-Text Citation: (Wu et al., 2020)
To Cite this Article: Wu, H.-H., Wei, L.-Y., Tsai, C.-H., Chung, Y.-C., & Lin, S.-F. (2020). A Study of TOC Supply Chain Replenishment System in LED Chip Manufacturing Plant. International Journal of Academic Research in Accounting Finance and Management Sciences, 10(3), 527–543.