Journal Screenshot

International Journal of Academic Research in Accounting, Finance and Management Sciences

Open Access Journal

ISSN: 2225-8329

Performing Lean Manufacturing System in Small and Medium Enterprises

Fakhraddin Maroofi, Samira Dehghan

Open access

This paper presents a conceptual framework to implement techniques for performing lean in the high-variety low volume (HVLV) environment. Lean production executed as a possible solution for many organizations. Anyhow the lean formula is appropriate directly only to the Build to stock business, but the customized product environment has to conform lean manufacturing principle. This paper has a two-phrase quantitative framework to convert small and medium enterprises (SMEs) to be lean. Phrase 1 has three interrelated parts: (1) redesigning an organization by using the power of computer Simulation integrated with business procedure. (2) Value stream mapping (VSM) is used to produce a map of both value and unused in a given procedure. This tool has also a main disadvantage for Small manufacturing ability because many value streams are made-up of hundreds of industrial parts and products. (3) Integrative supplier relationship is one of the most critical factors to sustain an advantage in the increasing levels of competition. Phrase 2 performs a just in time production scheme by using ant colony optimization technique combines with a Simulation tool. This paper addresses how to combine lean thought with Simulation optimization, the step of this framework to obtain the optimization solution.

Abdel-Malek, L., Kullpattaranirun, T., & Nanthavanij, S. (2005), "A framework for comparing outsourcing strategies in multi-layered supply chains," International Journal of Production Economics, Vol. 97, No. 3, pp. 318-328.
Alves, T. C. L., Tommelein, I. D., & Ballard, G. (2005) "Value streamn mapping for make-to-order products in a jobshop environment," Proceeding of the Construction Research Congress. Virginia, pp 1-10.
Berry, D., Nairn, M. M., & Towill, D. R. (1995), "Business process re-engineering an electronic products supply chain," IEE Process-Science Measurement Technology, Vol. 142, No. 5, pp. 395-403.
Braglia, M., Carmignani, G., & Zammori, F. (2006), "A new value stream mapping approach for complex production systems," International Journal of Production Research, Vol. 44, No. 18-19, pp. 3929–3952.
Carson, Y., & Maria, A. (1997) " Simulation optimization: methods and applications," Proceedings of the 30th conference on winter simulation. Geogia, pp 118-126.
Cheng, C. H., & Mon, D. L. (1994), " Evaluating weapon system by AHP based on fuzzy scale," Fuzzy Sets and Systems, Vol. 63, pp. 1-10.
Chitturi, R. M., Glew, D. J., & Paulls, A. (2007) "Value stream mapping in a jobshop," IET Conference Publications. Durham, UK, pp 142-147.
Colquhoun, G. J., Baines, R. W., & Crossley, R. (1993), "A state of the art review of IDEFO," International Journal of Computer Integrated Manufacturing, Vol. 6, No. 4, pp. 252-264.
Dorigo, M., & Gambardella, L. M. (1997), "Ant colonies for the travelling salesman problem," BioSystems, Vol. 43, pp. 73-81.
Eskandari, H., Rabelo, L., & Mollaghasemi, M. (2005) "Multiobjective simulation optimization using an enhanced genetic algorithm," Proceedings of the 37th conference on winter simulation. Florida, pp 833-841.
Eskandari, H., & Rabelo, L. (2007), "Handling uncertainty in the analytical hierarchy process: A stochastic approach," International Journal of Information Technology and Decision Making, Vol. 6, pp. 177-189.
Greasley, A. (2008), "Using simulation for facility design: A case study," Simulation Modelling Practice and Theory, Vol. 16, pp. 670-677.
Jain, A. S., & Meeran, S. (1998) "A state-of-the-art review of job-shop scheduling techniques." Dundee, Scotland: Department of Applied Physics, Electronic and Mechanical Engineering, University of Dundee, pp 1-48.
Mejtsky, G. J. (2008) "The improved sweep metaheuristic for simulation optimization and application to job shop scheduling," Proceedings of the 40th conference on Winter simulation. Florida, pp 731-739.
Panizzolo, R. (1998), "Applying the lessons learned from 27 lean manufacturers. The relevance of relationships management," International Journal of Production Economics, Vol. 55, No. 3, pp. 223-240.
Parry, G., Mills, J., & Turner, C. (2010), "Lean competence: integration of theories in operations management practice "Supply Chain Management: An International Journal, Vol. 15, No. 3, pp. 216-226.
Phalp, K. T. (1998), "CAP framework for business process modeling," Information and Software Technology, Vol. 40, No. 13, pp. 731-744.
Ruohonen, T., & Jokitalo, A. (2008) "The use of simulation for process improvement in metal industry case HTLasertekniikka," Proceedings of the 40th conference on winter simulation. Florida, pp 1891-1895.
Sarkis, J., & Talluri, S. (2002), "A model for strategic supplier selection," The Journal of Supply Chain Management, Vol. 38, No. 1, pp. 18-28.
Shah, R., & Ward, P. T. (2007), "Defining and developing measures of lean production," Journal of Operations Management, Vol. 25, No. 4, pp. 785-805.
Taj, S. (2008), "Lean manufacturing performance in China: assessment of 65 manufacturing plants," Journal of Manufacturing Technology Management, Vol. 19, No. 2, pp. 217-234.
Wanitwattanakosol, J., Holimchayachotikul, P., Nimsrikul, P., & Sopadang, A. (2010), "Performance improvement of freight logistics hub selection in Thailand by coordinated simulation and AHP," Industrial Enginereing & Management System, Vol. 9, No. 2, pp. 88-96.
Wanitwattanakosol, J., Nimsrikul, P., & Sopadang, A. (2009) "Selection the freight logistics hub in Thailand on the North-South economic corridors using MCDM: A fuzzy and stochastic approach," Proceedings of the IE Network Conference. Khon Kaen, pp 1366-1371.

In-Text Citation: (Maroofi & Dehghan, 2012)
To Cite this Article: Maroofi, F., & Dehghan, S. (2012). Performing Lean Manufacturing System in Small and Medium Enterprises. International Journal of Academic Research in Accounting Finance and Management Sciences, 2(3), 201–209.