Practices to Maintain Smooth Relationships Between Main Contractors and Subcontractors in the Malaysian Construction Industry

Nurul Huda Muhamad, Muhammad Azmil Akmal Mohd Zaini

http://dx.doi.org/10.6007/IJARBSS/v12-i8/14496

Open access

The Malaysian construction industry is commonly practicing a subcontracting. Due to improperly managed the relationships between main contractor and subcontractors, the performance of construction projects will be adversely impacted. Hence, the relationships between main contractors and subcontractors are becoming crucial to the success of construction projects. Therefore, the aim of this study is to recommend the practices to maintain smooth relationships between main contractors and subcontractors in the Malaysian construction industry. The practices were identified from the literature review and confirmed through a questionnaire survey. Questionnaire survey were distributed to 279 respondents with 26% of questionnaire returned rate. The results were analysed using SPSS version 28. The findings of this research revealed that the most recommended practices to maintain smooth relationships between main contractors and subcontractors was to select the subcontractors based on past experiences and reputation, followed by prepare a detail plan and schedule at each stage, payment allocation is on-time for progressively work done, consider and plan the financial expenses carefully and make a daily monitor to subcontractors’ progress. The outcomes of this research expected to provide valuable references for local main contractors to have a better understanding of their relationships with subcontractors in order to improve the performance of construction projects.

Abdullah, N. A. (2019). Basics of construction contracts: PAM, CIDB, PWD and FIDIC standard forms. Shah Alam, Selangor: UiTM Press.
Abdul-Rahman, H., Takim, R., & Min, W. S. (2009). Financial-related causes contributing to project delays. Journal of Retail & Leisure Property, 8(3), 225-238.
Adeyekun, A. J. (2019). An assessment of poor communication between the contractor and subcontractor. International Conference on Architecture and Civil Engineering, Department of Civil Engineering, Jagannath University, Delhi-NCR, India.
Ahmad, K. (2011). Construction economics. Petaling Jaya, Selangor: Pearson Malaysia.
Akintan, O. A., & Morledge, R. (2013). Improving the collaboration between main contractors and subcontractors within traditional construction procurement. Journal of Construction Engineering, 1-11.
Chen, Y., Okudan, G. E., & Riley, D. R. (2010). Sustainable performance criteria for construction method selection in concrete buildings. Automation in Construction, 19(2), 235-244.
Danso, H. (2014). Poor workmanship and lack of plant or equipment problems in the construction industry in Kumasi, Ghana. International Journal of Management Research, 2(3), 60-70.
Enshassi, A., Arain, F., & Tayeh, B. (2012). Major causes of problems between contractors and subcontractors in the Gaza Strip. Journal of Financial Management of Property and Construction, 17(1), 92-112.
Hoezen, M. E. L., Reymen, I. M. M. J., & Dewulf, G. P. M. R. (2006). The problem of communication in construction. CIB W96 Adaptable Conference, University of Twente.
Kusuma, B., Soemardi, B. W., Pribadi, K. S., & Yuliar, S. (2012). Indonesian contractor technological learning mechanism and its consideration. IOP Conference Series: Materials Science and Engineering, 6(1), 012001.
Krejcie, R. V., & Morgan, D. W. (1970). Determining sample size for research activities. Educational and Psychological Measurement, 30(3), 607-610.
Lagiman, S. (2017). Improvement of relationship between main contractor and subcontractor for successful construction project implementation (Degree Thesis, Universiti Tun Hussein Onn, Batu Pahat, Malaysia).
McDermott, P., Khalfan, M., & Swan, W. I. L. L. (2005). Trust in construction projects. Journal of Financial Management of Property and Construction.
Memon, A. H., Abdul Rahman, I., & Abdul Azis, A. A. (2011). Preliminary study on causative factors leading to construction cost overrun. International Journal of Sustainable Construction Engineering and Technology, 2(1), 57-71.
Mirawati, N. A., Othman, S. N., & Risyawati, M. I. (2015). Supplier-Contractor partnering impact on construction performance: A study on Malaysian construction industry. Journal of Economics, Business and Management, 3(1), 29-33.
Morkunaite, Z., Bausys, R., & Zavadskas, K. E. (2019). Contractor selection for Sgraffito decoration of cultural heritage building using the WASPAS-SVNS method. Sustainability Journal, 11(22), 6444.
Mudzvokorwa, T., Mwiya, B., & Mwnanaumo, E. M. (2020). Improving the contractor and subcontractor relationship through partnering on construction projects in Zambia. Journal of Construction Engineering and Project Management, 10(1), 1-15.
Priyadarshani, K., Karunasena, G., & Jayasuria, S. (2013). Construction safety assessment framework for developing countries: A case study of Sri Lanka. Journal of Construction in Developing Countries, 18(1), 33-51.
Rahman, S. A. H., Endut, I. R., Faisol, N., & Paydar, Soleyman. (2014). The importance of collaboration in construction industry from contractors’ perspectives. Procedia-Social and Behavioral Sciences, 129, 414-421.
Rahman, S. A. H., Endut, I. R., & Faisol, N. (2013). Current challenges towards successful relationship between main contractor and subcontractor. 2013 IEEE Business Engineering and Industrial Applications Colloquium (BEIAC), 489-493.
Sonmez, M., Yang, J. B., & Holt, G. D. (2001). Addressing the contractor selection problem using an evidential reasoning approach. Engineering, Construction and Architectural Management, 8(3), 198-210.
Shivanthi, B. K. C., Devapriya, K. A. K., & Pandithawatta, T. P. W. S. I. (2019). Disputes between main contractor and subcontractor: Causes and preventions. 8th World Construction Symposium.
Tan, Y., & Xue, B. (2017). Relationships between main contractors and subcontractors and their impacts on main contractor competitiveness: An empirical study in Hong Kong. Journal of Construction Engineering Management, 143(7), 05017007-1-05017007-11.
Tayeh, B. A. (2009). The Relationship Between Contractors and Their Subcontractors in Gaza Strip (Master Thesis, The Islamic University of Gaza-Palestine).
Teo, E. A. L., Ling, F. Y. Y., & Ong, D. S. Y. (2005). Fostering safe work behaviour in workers at construction sites. Engineering, Construction and Architectural Management, 12(4), 410-422.
Thomas, H. R., & Flynn, C. J. (2011). Fundamental principles of subcontractor management. Practice Periodical on Structural Design and Construction, 16(3), 106-111.
White, H., & Marasini, R. (2014). Management of interface between main contractor and subcontractors for successful project outcomes. Journal of Engineering, Project, and Production Management, 4(1), 36-50.
Wood, G. D., & Ellis, R. C. (2005). Main contractor experiences of partnering relationships on UK construction projects. Construction Management and Economics, 23(3), 317-325.
Ye, K. M., & Rahman, H. A. (2010). Risk of late payment in the Malaysian construction industry. International Journal of Mechanical and Industrial Engineering, 4(5), 503-511.

In-Text Citation: (Muhamad & Zaini, 2022)
To Cite this Article: Muhamad, N. H., & Zaini, M. A. A. M. (2022). Practices to Maintain Smooth Relationships Between Main Contractors and Subcontractors in the Malaysian Construction Industry. International Journal of Academic Research in Business and Social Sciences, 12(8), 818 – 829.