Journal Screenshot

International Journal of Academic Research in Business and Social Sciences

Open Access Journal

ISSN: 2222-6990

Supply Chain Management to Overcome Demotivation in Adopting Industrialised Building System of Malaysian Construction Industry

Mohd Firdaus Zainuddin, Salman Riazi Mehdi Riazi, Fairiz Miza Yop Zain, Mohamad Tajudin Saidin, Mohd Hafiz Saberi

http://dx.doi.org/10.6007/IJARBSS/v12-i8/14670

Open access

Low adoption rate of Industrialized Building System (IBS) is an issue in Malaysian construction industry. Promoting its use is one of the initiatives of the Malaysian Construction Industry Transformation Program. As incentives have been offered by the government to the IBS adopters, low adoption rates are seen to be potentially due to demotivation of the contractors. This paper reports on the progress to date of a Ph.D. research project aimed on Supply Chain Management (SCM) framework development on to increase the IBS adoption by contractors. Supported by successful examples in the UK, there is confidence that the proposed SCM framework would bring positive results if implemented in Malaysia. Malaysian Public sector governance has identified the potential of SCM and aimed to utilize it through the Construction Industry Transformation Program 2016. A thorough review of literatures, survey and structured interview approach will be used to achieve the research objectives. The outcome of the research will be the groundwork that addresses the root demotivating factors and determine the SCM tools implementation to diminish them.

Abd Shukor, A. S., Mohammad, M. F., Mahbub, R., & Ismail, F. (2011). Supply chain integration in industralised building system in the Malaysian construction industry. The Built & Human Environment Review, 4(1), 108-121.
Abdul Kadir, M. R., Lee, W. P., Jaafar, M. S., Sapuan, S. M., & Ali, A. A. A. (2006). Construction performance comparison between conventional and industrialised building systems in Malaysia. Structural Survey, 24(5), 412-424.
Abdul, A. A., Hamzah, A. R., Zakaria, H., Ali, M. A., & Abdul, M. B. (2010). Literature mapping: A birds eye view on classification of factors influencing project success. African Journal of Business Management, 4(19), 4174-4182.
Bajaj, S. K. (2006). Human resource management in building industry, Journal of Indian Building Congress, 13(2), 37-42
Barker, R., Hong-Minh, S., & Naim, M. M. (2000). The terrain scanning methodology, Assessing and improving construction supply chains. European Journal of Purchasing & Supply Management, 6(3-4), 179-193.
Borcherding, J. D., & Oglesby, C. H. (1977, October). Motivating the lower-level supervisory staff and work force on super projects. In Project Management Institute Proceedings, Ninth Annual Seminar/Symposium (Vol. 237, p. 248).
Brady, T., Davies, A., Gann, D., & Rush, H. (2006). Learning to manage mega projects: the case of BAA and Heathrow Terminal 5. Learning to manage mega projects: The case of BAA and Heathrow Terminal 5.
Busby, J. S., & Hughes, E. J. (2004). Projects, pathogens, and incubation periods. International Journal of Project Management, 22(5), 425-434.
Cheng, J. C., Law, K. H., Bjornsson, H., Jones, A., & Sriram, R. (2010). A service-oriented framework for construction supply chain integration. Automation in construction, 19(2), 245-260.
Chung, E. C. J. (2005). Motivational Needs of Civil Engineers in Construction Sector (Doctoral dissertation, Universiti Teknologi Malaysia).
CIDB. (2003). Industrialised Building System (IBS) Roadmap 2003-2010 Construction Industry Development Board (CIDB), Kuala Lumpur
CIDB. (2012). Malaysia country report. Paper presented at the 18th Asia Construct Conference, Marina Bay Sands, Singapore.
Cigolini, R., Cozzi, M., & Perona, M. (2004). A new framework for supply chain management: conceptual model and empirical test. International Journal of Operations & Production Management, 24(1), 7-41.
Construction Industry Master Plan Malaysia (CIMP) 2006-2015. (2007) Construction Industry Development Board Malaysia (CIDB). Kuala Lumpur, Malaysia: CIDB.
Construction Industry Transformation Programme 2016-2020. (2016). Construction Industry Development Board Malaysia (CIDB). Kuala Lumpur, Malaysia: CIDB.
Dörnyei, Z., & Ushioda, E. (2013). Teaching and researching: Motivation. Routledge.
Dubois, A., & Gadde, L. E. (2000). Supply strategy and network effects—purchasing behaviour in the construction industry. European journal of purchasing & supply management, 6(3-4), 207-215.
Egan, J. (1998). Rethinking Construction, London: Department of the Environment, Transport and the Regions & HMSO
Egan, J. (2002). Rethinking construction accelerating change-a consultation paper by the strategic forum for construction.
Eriksson, P. E. (2008). Procurement effects on coopetition in client-contractor relationships. Journal of construction Engineering and Management, 134(2), 103-111.
Hamid, Z. A., & Kamar, K. A. M. (2010) Modernising the Malaysian construction industry. In P. Barrett, D. Amaratunga, R. Haigh, K. Keraminiyage, & C. Pathirage (Eds.), Proceedings of the 18th CIB World Building Congress (pp. 267-280). Rotterdam, the Netherlands: CIB.
Hanafi, M. H., Abdullah, S., & Razak, A. A. (2015). Contractors' Perspective on the Benefits of Implementing Industrialized Building System (IBS). International Journal of Sustainable Construction Engineering and Technology, 6(1), 44-51.
Horvath, L. (2001). Collaboration: the key to value creation in supply chain management. Supply chain management: an international journal, 6(5), 205-207.
Huang, S. M., Kwan, I. S., & Hung, Y. C. (2001). Planning enterprise resources by use of a reengineering approach to build a global logistics management system. Industrial Management & Data Systems.
Ibrahim, A. R. B., Roy, M. H., Ahmed, Z., & Imtiaz, G. (2010). An investigation of the status of the Malaysian construction industry. Benchmarking: An International Journal.
Isaac, S., & Michael, W. B. (1981). Handbook in research and evaluation: For education and the behavioral sciences.
Jenkins, J. R., Douglas, G., & Laufer, A. (1982). Improving construction productivity: the case for motivation. AACE Transactions.
Kamar, K. A. M., Azman, M. N. A., & Nawi, M. N. M. (2014). IBS survey 2010: Drivers, barriers and critical success factors in adopting industrialised building system (IBS) construction by G7 contractors in Malaysia. Journal of Engineering Science and Technology, 9(4), 490-501.
Kamar, K. M., Alshawi, M., & Hamid, Z. (2009, January). Barriers to industrialized building system (IBS): The case of Malaysia. In Proceedings of the BuHu 9th international postgraduate research conference (IPGRC), Salford, UK (Vol. 30).
Kazaz, A., Manisali, E., & Ulubeyli, S. (2008). Effect of basic motivational factors on construction workforce productivity in Turkey. Journal of civil engineering and management, 14(2), 95-106.
Khan, M. S. (1993). Methods of motivating for increased productivity. Journal of Management in Engineering, 9(2), 148-156.
Kumaraswamy, M. M., Rahman, M., EKAMBARAM, P., Ugwu, O. O., & Anvuur, A. (2007, September). Multi-disciplinary and multi-functional teams in PPP procurement & delivery. In CIB W092 Procurement Systems Symposium on Building across Borders (pp. 250-262).
Lambert, D. M., Cooper, M. C., & Pagh, J. D. (1998). Supply chain management: implementation issues and research opportunities. The international journal of logistics management, 9(2), 1-20.
Lewis, W. A. (1955). The theory of economic growth, Homewood, IL: Richard D.
Love, P. E., Irani, Z., & Edwards, D. J. (2004). A seamless supply chain management model for construction. Supply chain management: an international journal.
McCreadie, M., & Rice, R. E. (1999). Trends in analyzing access to information. Part I: cross-disciplinary conceptualizations of access. Information processing & management, 35(1), 45-76.
McFarland, T. D. (1994). Managing performance of engineers. Journal of Management in Engineering, 10(5), 28-33.
Riazi, M. S. R. (2014). The use of supply chain management to reduce delays as result of pre-construction deficiencies in Malaysian public sector construction projects (Doctoral dissertation, Queensland University of Technology).
Riazi, M. S., & Lamari, F. (2013). Public sector project delay: the Malaysian perspective and the way forward. In Proceedings of the 19th International CIB World Building Congress, Brisbane 2013: Construction and Society (pp. 1-12). Queensland University of Technology.
Mohamad, D., Ramli, M. Z., Danuri, H. N., & Sapuan, W. K. (2016). Demand of the industrialized building system (IBS) implementation in Malaysian government projects. Journal of Scientific Research and Development, 3(4), 77-82.
Nawi, M. N. M., Lee, A., Kamar, K. A. M., & Hamid, Z. A. (2012). Critical success factors for improving team integration in Industrialised Building System (IBS) construction projects: The Malaysian case. Malaysian Construction Research Journal, 10(1), 45-63.
Ng, S. T., Skitmore, R. M., Lam, K. C., & Poon, A. W. (2004). Demotivating factors influencing the productivity of civil engineering projects. International journal of project Management, 22(2), 139-146.
O'Brien, W. J., Formoso, C. T., Ruben, V., & London, K. (2008). Construction supply chain management handbook. CRC press.
Pang, A. T. (2016). Facilities, incentives and challenges in the Adoption of Industrialised Building System in Malaysia. In: International Construction Week Ecobuild. Kuala Lumpur: MIDA
Parkin, A. B., Tutesigensi, A., & Büyükalp, A. I. (2009). Motivation among construction workers in Turkey. In Proceedings 25th Annual Conference. ARCOM.
Pearson, A. (1999). Chain reaction. Building, 264(10), 54-5.
Potts, K. (2009). From Heathrow express to Heathrow terminal 5: BAA’s development of Supply Chain Management. Construction supply chain management: concepts and case studies. Oxford: Blackwell Publishing, 160-181.
Rashid, K. A. (2002). Construction Procurement in Malaysia: Processes and Systems: Constraints and Strategies. Research Centre, International Islamic University Malaysia.
Reason, J. (1990). Human error. Cambridge university press.
Sakai, H., & Kikuchi, K. (2009). An analysis of demotivators in the EFL classroom. System, 37(1), 57-69.
Shaari, S. N., & Malaysia, C. I. D. B. (2006). IBS Roadmap 2003-2010: The Progress And Challenges. Master Builders 4th Quarterly 2006.
Shroff, R. P., & Sridhar, S. (2011). Study of motivators and demotivators affecting the performance of employees in the construction industry–an exploratory study. International Journal of Construction Management, 11(3), 49-66.
Smithers, G. L., & Walker, D. H. (2000). The effect of the workplace on motivation and demotivation of construction professionals. Construction management and economics, 18(7), 833-841.
Sundaraj, G. (2007). The way forward: construction industry master plan 2006-2015. Master Builders, 48-51.
Venkatesan, R., Varghese, K., & Ananthanarayanan, K. (2009, September). Motivation and demotivation cause factors for engineers in construction organizations. In Proceedings for the 25th Annual ARCOM Conference (pp. 145-153).
Vrijhoef, R., & Koskela, L. (2000). The four roles of supply chain management in construction. European journal of purchasing & supply management, 6(3-4), 169-178.
Yunus, R., Abdullah, A. H., Yasin, M. N., Masrom, M. A. N., & Hanipah, M. H. (2016). Examining performance of Industrialized Building System (IBS) implementation based on contractor satisfaction assessment. ARPN Journal of Engineering and Applied Sciences, 11(6), 3776-3782.
Zakeri, M., Olomolaiye, P., Holt, G. D., & Harris, F. C. (1997). Factors affecting the motivation of Iranian construction operatives. Building and Environment, 32(2), 161-166.

In-Text Citation: (Zainuddin et al., 2022)
To Cite this Article: Zainuddin, M. F., Riazi, S. R. M., Zain, F. M. Y., Saidin, M. T., & Saberi, M. H. (2022). Supply Chain Management to Overcome Demotivation in Adopting Industrialised Building System of Malaysian Construction Industry. International Journal of Academic Research in Business and Social Sciences, 12(8), 1018 – 1030.