Project Performance Impact Factors among Developers in Malaysian Private Projects

Rozana Mohamed Salleh, Nor Atiqah Mustapa, Danish Wafri Dzain, Asmalia Che Ahmad

http://dx.doi.org/10.6007/IJAREMS/v11-i3/14482

Open access

Project performance indicator as of time, quality and cost are all indicators used to determine the successful of the project. Poor project performance, on the other hand, has always become a drawback for construction players especially the developer. Therefore, the research aims to investigate the impact factors that affect in project performance among the developers. The objective of the research is to identify the challenges faced by developers that contribute to project performance under private projects. Questionnaire survey were distributed to 226 respondents within the Johor State with 69% of questionnaire returned rate. Descriptive analysis has been used for the data analysis by using the Statistical Packages for Social Sciences (SPSS) version 28. Based on the analysis, respondents agreed that financial problems during the construction process and late making decisions were the major challenges faced by the developers in project performance. The recommendation that was suggested in this research can be taken to action to improve the project performance under private project in Johor.

Alade, K. T., Lawal, A. F., Omonori, A. A., & Olowokere, E. N. (2016). Causes and effects of delays in construction projects in Akure, Ondo State, Nigeria. FUTA
Journal of Management and Technology, Maiden Edition, 29-38. Azman, M. N. A., Dzulkalnine, N., Abd Hamid, Z., & Beng, K. W. (2014). Payment Issue in Malaysian Construction Industry: Contractor Perspective. Jurnal Teknologi, 70(1).
Badroldin, M. K. A. M., Hamid, A. R. A., Raman, S. A., Zakaria, R., & Mohandes, S. R. (2016). Late payment practices in the Malaysian construction industry. Malaysian Journal of Civil Engineering, 28.
Gardezi, S. S. S., Manarvi, I. A., & Gardezi, S. J. S. (2014). Time extension factors in construction industry of Pakistan. Procedia Engineering, 77, 196-204.
Idrees, S., & Shafiq, M. T. (2021). Factors for Time and Cost Overrun in Public Projects. Journal of Engineering, Project & Production Management, 11(3).
Ingle, P. V., & Mahesh, G. (2020). Construction project performance areas for Indian construction projects. International Journal of Construction Management, 1-12.
Jatarona, N. A., Yusof, A. M., Ismail, S., & Saar, C. C. (2016). Public construction projects performance in Malaysia. Journal of Southeast Asian Research, 2016, 1 7
Johnson, R. M., & Babu, R. I. I. (2020). Time and cost overruns in the UAE construction industry: a critical analysis. International Journal of Construction Management, 20(5), 402-411.
Kamaruddeen, A. M., Sung, C. F., & Wahi, W. (2020). A study on factors causing cost overrun of construction projects in Sarawak, Malaysia. Civil Engineering and Architecture, 8(3), 191-199.
Khairani Haji Ahmad. (2011). Construction economics. Petaling Jaya: Pearson Malaysia.
Krejcie, R. V., & Morgan, D. W. (1970). Determining Sample Size for Research Activities. Educational and psychological measurement, 30(3), 607-610.
Lindhard, S., & Larsen, J. K. (2016). Identifying the key process factors affecting project performance. Engineering, construction and architectural management.
Mahamid, I. (2016). Factors contributing to poor performance in construction projects: studies of Saudi Arabia. Australian Journal of Multi-Disciplinary Engineering, 12(1), 27-38.
Mallawaarachchi, H., & Senaratne, S. (2015). Importance of quality for construction project success. 6th ICSECM, 84-89.
Medway, R. L., & Fulton, J. (2012). When more gets you less: a meta-analysis of the effect of concurrent web options on mail survey response rates. Public opinion quarterly, 76(4), 733-746
Memon, A. H., Rahman, I. A., Akram, M., & Ali, N. M. (2014). Significant factors causing time overrun in construction projects of Peninsular Malaysia. Modern Applied Science, 8(4), 16.
News Strait Times (2021). Available at:
https://www.nst.com.my/property/2021/10/740545/kpkt-78-abandoned-housing-projects-peninsular-malaysia. Accessed on 2 September 2022.
Nyangwara, P. O., and Datche, E. (2015) Factors Affecting the Performance of Construction Projects: A Survey of Construction Projects in the Coastal Region of Kenya. International Journal of Scientific and Research Publications, 5, 1-43.
Obodoh, D. A., & Obodoh, C. (2016). Causes and Effects of Construction Project Delays in Nigerian Construction Industry. International Journal of Innovative Science, Engineering & Technology, 3(5), 65-84.
Ogunlana, S. O. (2010). Beyond the ‘iron triangle’: Stakeholder perception of key performance indicators (KPIs) for large-scale public sector development projects. International journal of project management, 28(3), 228-236.
Oppong, G. D., Chan, A. P., & Dansoh, A. (2017). A review of stakeholder management performance attributes in construction projects. International journal of project management, 35(6), 1037-1051.
Ojoko, E. O., Tanko, B. L., Jibrin, M., Ojoko, O., & Enegbuma, W. L. (2016). Project delay causes and effects in the construction industry. In IGCESH. Proceedings of the 6th International Graduate Conference on Engineering, Science and Humanities, 15th (pp. 221-223).
Ramanathan, C., Potty, N. S., & Idrus, A. B. (2012). Analysis of time and cost overrun in Malaysian construction. In Advanced Materials Research (Vol. 452, pp. 1002-1008). Trans Tech Publications Ltd.
Samarah, A., & Bekr, G. A. (2016). Causes and effects of delay in public construction projects in Jordan. American Journal of Engineering Research, 5(5), 87-94.
Shehu, Z., Endut, I. R., Akintoye, A., & Holt, G. D. (2014). Cost overrun in the Malaysian construction industry projects: A deeper insight. International Journal of Project Management, 32(8), 1471-1480.
Shibani, A., & Arumugam, K. (2015). Avoiding cost overruns in construction projectsin India. Management Studies, 3(7-8), 192-202
Subramani, T., Lishitha, P., & Kavitha, M. (2014). Time Overrun and Cost Effectiveness in the Construction Industry. International Journal of Engineering Research and Applications, 4(6), 111-116.
Ullah, K., Abdullah, A. H., Nagapan, S., Suhoo, S., & Khan, M. S. (2017). Theoretical framework of the causes of construction time and cost overruns. In IOP

In-Text Citation: (Salleh et al., 2022)
To Cite this Article: Salleh, R. M., Mustapa, N. A., Dzain, D. W. bin, & Ahmad, A. C. (2022). Project Performance Impact Factors among Developers in Malaysian Private Projects. International Journal of Acdemic Research in Economics & Management Sciences, 11(3), 178–184.