ISSN: 2222-6990
Open access
Stakeholder involvement plays an important and critical role in project performance. In Guinea, the Administration and Control of Major Projects and Public Procurement (ACMPPP) has initiated a huge reforms and reorganizations of development projects implementation since 2014. This has involved different stakeholders who include: the Government through the operating Ministries, International Institutions such as United Nations Development Program, World Bank, Africa Development Bank etc., Construction and Manufacturing Companies as well as Non-Governmental Organizations. This paper will examine the literature around the stakeholders’ involvement concepts to address their influence in project identification, planning, implementation and monitoring on development project performance within organizations in Guinea.
Achterkamp, M. C., & Vos, J. F. (2008). Investigating the use of the stakeholder notion in project management literature, a meta-analysis. International Journal of Project Management, 26(7), 749-757.
Albert, H. (2004). Handbook of Project Management Procedures. England: TTL publishing Ltd.
Alegre, J., & Garau, J. (2010). Tourist satisfaction and dissatisfaction. Annals of tourism research, 37(1), 52-73.
Atiibo, K. A (2012). Examining Stakeholder Management Challenges and Their Impact on Project Management in the Case of Advocacy and Empowerment NGOs in the Upper East Region of Ghana. Thesis Report.
Atkin, B., & Skitmore, M. (2008). Stakeholder management in construction. Construction Management and Economics, 26(6), 549-552.
Betsill, M. Barry. G. Rabe (2009)." Climate Change and Multilevel Governance: The Evolving State and Local Roles.” Toward sustainable communities: transition and transformations in environmental policy.
Boonstra, A. (2006): Interpreting an ERP-implementation project from a stakeholder perspective. International Journal of Project Management, 24(1), pp. 38–52.
Bryson, J. M., Quick, K. S., Slotterback, C. S., & Crosby, B. C. (2013). Designing public participation processes. Public administration review, 73(1), 23-34.
Carol, Y., Cohen, M.W. & Palmer, G.R. (2004). Project risk identification and management, AACE International Transactions.
Chang, Y. (2013). Performance measurement and adoption of balanced scorecards: a survey of municipal governments in the USA and Canada, International Journal of Public Sector Management, 17 No.3, pp.204-21.
Cleland & Ireland, (2002). Project Management: Strategic Design and implementation, McGraw-Hill Professional, USA, p210.
Cleland, D. I., & Ireland, L. R. (1999). Project management: strategic design and implementation (Vol. 4). Singapore: McGraw-Hill.
Coulter, M. K., & Coulter, M. K. (2002). Strategic management in action (p. 7). Upper Saddle River, NJ: Prentice Hall.
Curley, M. Steve and Ricky, (2006). Voluntary Management; Mobilization of the Community Resources, 195.
Dean Jr, J. W., & Bowen, D. E. (1994). Management theory and total quality: improving research and practice through theory development. Academy of management review, 19(3), 392-418.
Duncan, W. R. (1996). A guide to the project management body of knowledge.
Fayol, H. (1949). General and industrial administration. NY: Pitman.
Flanagan, G. & Norman U. (2003). Assessment and Control of project Risks. Englewood Cliffs: Prentice-Hall.
Floricel, S. & Miller, R. (2001). Strategizing for anticipated risks and turbulence in large-scale engineering projects. International Journal of Project Management. 19, 445–455.
Freeman, M., & Beale, P. (1992). Measuring project success. Project Management Institute.
Freeman, R. E. (1984). Strategic management: A stakeholder approach. Boston: Pitman. Latest edition Strategic Management: A Stakeholder Approach Freeman, R. E. 1994. The politics of stakeholder theory: Some future directions. Business Ethics Quarterly 4: pp. 409-421
Katiku, F. K. (2011). Factors influencing the rehabilitation of street children in Kisii Town; Kisii County (Doctoral dissertation, University of Nairobi, Kenya).
Kululanga, G. & Kuotcha, W. S (2010) Measuring Project Risk Management Process For Construction Contractors With Statement Indicators Linked to Numerical Scores. Engineering, Construction and Architectural Management, 17 Issue: 4, pp.336 – 351
Lekunze, P., (2001). A critical Success Factors Model for Projects Rise in Planning and Implementation, Proceedings of the 7th European Conference on Information Systems Reports.
Madeeha, S. & Imran, H. N. (2014).Impact of Internal Stakeholder’s Engagement on Project Portfolio Management Success, it Industry in Lahore, Pakistan. Journal of Science International (Lahore), 26(4), 1777-1782.
Malunga, C. & Banda, C., (2004).Understanding Organizational Sustainability through African Proverbs. Washington: Pact Publications.
Menoka, R. (
In-Text Citation: (Magassouba, Tambi, Alkhlaifat, & Abdullah, 2019)
To Cite this Article: Magassouba, S. M., Tambi, A. M. B. A., Alkhlaifat, B. I., & Abdullah, A. A. Bin. (2019). Influence of Stakeholders Involvement on Development Project Performance in Guinea. International Journal of Academic Research in Business and Social Sciences, 9(1), 1111–1120.
Copyright: © 2018 The Author(s)
Published by Human Resource Management Academic Research Society (www.hrmars.com)
This article is published under the Creative Commons Attribution (CC BY 4.0) license. Anyone may reproduce, distribute, translate and create derivative works of this article (for both commercial and non-commercial purposes), subject to full attribution to the original publication and authors. The full terms of this license may be seen at: http://creativecommons.org/licences/by/4.0/legalcode